My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-28_PERMIT FILE - C2010089A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2016-10-28_PERMIT FILE - C2010089A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2017 9:22:44 AM
Creation date
1/31/2017 9:15:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
Permit File
Doc Date
10/28/2016
Doc Name
Pond NHN-002 As-Built
Section_Exhibit Name
Appendix 2.05.3‎(4)‎-10
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEDCAD 4 for Windows <br />r—,rinhl 100A -9nln P-1. I Crh,-1, <br />Structure Detail; <br />Structure #1 (Culvert) <br />Pit Pumping <br />Culvert Inputs: <br />Max. Tailwater Entrance <br />Length (ft) Slope (%) Manning's n Headwater (ft) Loss Coef. <br />(ft) (Ke) <br />1,000.00 2.00 0.0140 1.00 0.00 0.90 <br />Culvert Results: <br />Design Discharge = 2.01 cfs <br />Minimum pipe diameter: 1 - 12 inch pipe(s) required <br />Structure #2 (Pond) <br />Pond NHN-002 <br />Pond Inputs: <br />Initial Pool Elev: <br />5,678.25 ft <br />Initial Pool: <br />4.66 ac -ft <br />*Sediment Storage: <br />2.27 ac -ft <br />Dead Space: <br />20.00% <br />*Sediment capacity based on A verage Annual R of 20.0 for 3 year(s) <br />Perforated Riser <br />Riser <br />Riser Height <br />Barrel <br />Barrel Barrel Slope <br />Number of <br />Spillway Elev <br />Diameter (ft) <br />Diameter Length (ft) (%) <br />Mannings n (ft) Holes per <br />(in) <br />(in) <br />Elev <br />18.00 3.90 <br />18.00 40.00 1.00 <br />0.0150 5,681.90 2 <br />Pond Results: <br />Emeraencv SDillwa <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />5,683.00 30.00 3.60:1 3.20:1 8.10 <br />Peak Elevation: <br />5,681.89 ft <br />H'graph Detention Time: <br />17.01 hrs <br />Pond Model: <br />CSTRS <br />Dewater Time: <br />14.18 days <br />Trap Efficiency: <br />96.83% <br />[:1 <br />Filename: Pond NHN-002 10YR EVENT PRINCIPAL SPILLWAY OPEN 07-JUL-15.sc4 Printed 07-07-2015 <br />Appendix 2.05.3(4)-10 Page 10 July 2015 (TR -10) <br />
The URL can be used to link to this page
Your browser does not support the video tag.