Sediment Pond Capacity Demonstration <br />Pond NHN-002 needs to be able to store the 10 -YR, 24 -HR event and pit pumping on top of the <br />three year sediment volume storage. SEDCAD was used to analyze the hydrology and <br />sedimentology of the 10 -YR event scenario, and as can be seen in the SEDCAD Model for this <br />scenario, the top of the water plus sediment storage is 2.98 feet below the emergency spillway, <br />and 0.98 feet below the top of the principal spillway riser entrance. The stage storage curve on <br />Map 2.05.3(4)-9 also shows that the design of Pond NHN-002 is more than sufficient for the 10 - <br />YR event. The SEDCAD Model which shows the 25 -YR, 24 -HR event with the pond design, <br />shows that the emergency spillway will safely convey the peak stage with over a foot of <br />freeboard remaining. The entire 25 -YR event discharge will pass out of the pond via the <br />principal and emergency spillway pipes. These two pipes will each be 18 inches in diameter. As <br />can be seen in this SEDCAD run, the total pipe diameter needed is 21 inches, therefore a pair of <br />18 inch diameter pipes will be sufficient. <br />NHN-002 Ditch Designs <br />Two ditches will convey stormwater runoff to Pond NHN-002: NHN-002 North and NHN-002 <br />South. Each of these ditches has been designed to convey the 10 -YR, 24 -HR event flow to the <br />sediment pond. Table 2.05.3(4)-8-1 shows the peak flows for the sub -watersheds that feed each <br />ditch. Sub -watershed SW2-A feeds NHN-002 South, while SW2C feeds NHN-002 North, <br />leaving the remainder of SW2 (SW2-B) draining directly into Pond NHN-002. Map 2.05.3(4)-9 <br />shows the anticipated route for each ditch as well as the sub -watersheds. Both ditches are <br />designed to use a trapezoidal cross section with sideslopes no steeper than 2H:1 V. This design <br />will facilitate ease of construction given the size and length of the ditches. <br />Map 2.05.3(4)-9 shows the route of both NHN-002 North and NHN-002 South ditches, profiles <br />with the anticipated grades of the ditches, and design details and criteria for each. It is anticipated <br />that only one portion of the NHN-002 South will be steep enough to require riprap lining. The <br />remaining segments of NHN-002 South and all of NHN-002 North will have excavated <br />overburden as their lining. The 10 -YR, 24 -HR event SEDCAD Model shows the ditch designs <br />based on the appropriate sub -watersheds and channel lining. <br />Table 2.05.3(4)-8-2 NHN-002 Ditch Design Parameters <br />Ditch <br />Station <br />Cumulative <br />Flow (cfs) <br />Slope <br />(%) <br />Minimum <br />Bottom <br />Width (ft) <br />Side <br />Slope <br />(HAV) <br />Rip <br />Rap <br />D50 (in) <br />NHN-002 South <br />0+00 to 7+75 <br />12.27 <br />1-5 <br />12.0 <br />2.0 <br />N/A <br />7+75 to 11+00 <br />14.73 <br />6-10 <br />12.0 <br />2.0 <br />3.0 <br />NHN-002 North <br />0+00 to 9+00 <br />11.85 <br />1-5 <br />12.0 <br />2.0 <br />N/A <br />9+00 to 30+30 <br />26.89 <br />1 1-4 <br />12.0 <br />2.0N/A <br />Appendix 2.05.3(4)-8 Page 3 April 2016 (PR -01) <br />