My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-30_REVISION - C2010089
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2017-01-30_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2017 11:10:57 AM
Creation date
1/30/2017 10:31:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
1/30/2017
Doc Name
Adequacy Review Memo and RCE
From
Jason Musick
To
Brock Bowles
Type & Sequence
RN1
Email Name
JDM
DIH
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />TRUCK/LOADER TEAM WORK <br /> <br />Task description: Backfill Final Pit with Overburden Stockpile <br />Site: New Horizon North Mine Permit Action: RN1 Permit/Job#: C2010089 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado Abbreviation: None <br />Date: 1/27/2017 County: Montrose Filename: C089-002 <br />User: JDM <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST Shift basis: 1 per day Equipment Description <br />Truck Loader Team -Truck: Cat 777F <br />-Loader: CAT 992K <br />Support Equipment -Load Area: Cat D11T - 11U <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 10,000 Gal. <br /> <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor <br />Grader <br />Water Truck <br />%Utilization-machine: 100 100 100 NA 35 35 <br />Ownership cost/hour: $169.21 $186.67 $222.81 NA $53.53 $59.07 <br />Operating cost/hour: $136.86 $176.60 $218.91 NA $19.85 $36.77 <br />%Utilization-riper: NA 0 NA NA NA NA <br />Ripper own. cost/hour: NA $0.00 $0.00 NA $0.00 $0.00 <br />Ripper op. cost/hour: NA $0.00 $0.00 NA $0.00 $0.00 <br />Operator cost/hour: $22.10 $38.60 $38.89 NA $35.83 $29.42 <br />Unit Subtotals: $328.17 $401.87 $480.61 NA $109.21 $125.26 <br />Number of Units: 3 1 1 0 1 1 <br />Group Subtotals: Work: $1,386.38 Support: $480.61 Maint: $234.47 <br />Total work team cost/hour: $2,101.46 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 900,000 CCY Swell factor: 1.000 <br />Loose volume: 900,000 LCY <br />Source of estimated volume: Map 2.05.2-1 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00
The URL can be used to link to this page
Your browser does not support the video tag.