Laserfiche WebLink
Coal removal at NHN Mine began in mid -2013 and is expected to continue through 2020. The <br />coal quantities required from the NHN Mine under Western Fuels -Colorado's contract to supply <br />Tri -State's Nucla Station are estimated to be about 250,000 tons to 460,000 tons per year. For the <br />purpose of this permit application, the maximum rate of 460,000 tons per year was assumed. <br />Whenever possible, overburden stripping and coal loading will be sequenced to maintain an in - <br />pit inventory of approximately one month's coal requirements. Additionally, coal loading will be <br />sequenced to allow blending to enable delivery of the required quality coal to the power plant. <br />TABLE 2.05.2-1 <br />MAJOR MINING EQUIPMENT <br />NEW HORIZON NORTH MINE, MONTROSE COUNTY, COLORADO <br />PRIMARY EXCAVATION EQUIPMENT <br />ACRES <br />DISTURBED <br />Equipment Type <br />OB/PARTING <br />CUBIC YARDS <br />Quantity <br />Capacity <br />Hydraulic Shovel <br />1,323,044 <br />1 <br />20 cubic yards <br />End Dump Truck <br />83.5 <br />4 <br />100 tons <br />Crawler Tractor <br />TOTAL <br />2 <br />400 horsepower <br />Crawler Tractor <br />7.53:1 <br />1 <br />770 horsepower <br />MAJOR SUPPORT EQUIPMENT <br />Equipment Type <br />Quantity <br />Capacity <br />Overburden Drill <br />1 <br />6-3/4" diameter <br />Wheel Loader <br />1 <br />7 cubic yards <br />Wheel Loader <br />1 <br />17 cubic yards <br />Motor Grader <br />1 <br />200 horsepower <br />Water Truck <br />1 <br />9,000 gallons <br />TABLE 2.05.2-2 <br />MINING OPERATION STATISTICS <br />NEW HORIZON NORTH MINE <br />YEAR <br />ACRES <br />DISTURBED <br />COAL <br />TONS <br />OB/PARTING <br />CUBIC YARDS <br />STRIPPING <br />RATIO <br />2013-2017 <br />195.8 <br />1,323,044 <br />11,748,520 <br />8.88:1 <br />2018-2020 <br />83.5 <br />679,037 <br />3,335,173 <br />4.91:1 <br />TOTAL <br />279.3 <br />2,002,081 <br />15,083,693 <br />7.53:1 <br />Section 2.05.2 Page 2 April 2016 (PR -01) <br />