Laserfiche WebLink
Pt -5-50 <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Date: Monday, 10/24/16 <br />Arrive Time: 10:30 AM <br />Depart Time: <br />Project Name: RPEE <br />Weather: Clear <br />Project Number: M16001MT <br />Temp: <br />Client: Mountain Coal <br />Client Representative: Ty Hyatt <br />General Contractor: <br />Supervisor: <br />Specialty Contractor: Beavers <br />Specialty Superintendent or Foreman: Bill Chesnik <br />Construction <br />Source of Fill Material: Borrow area <br />Plans and Specs: <br />Prepared by: Dated: <br />Contractor's Equipment Used: Excavator, loader, dozer, vibratory smooth durm compactor <br />Lambert and Associates Equipment Used - Manufacturer: CPN Serial Number or Unit Number: 18 <br />Test Results were Verbally Given Onsite to: Bill Chesnick <br />Expected Conditions Observed: yes <br />Unexpected Conditions Observed: No <br />Unusual Conditions Observed: <br />If yes, who was contacted? <br />Follow-up from Prior Retests Performed: No <br />Visit: <br />Concerns for Next Visit: Retests Needed: No <br />Other personnel contacted on-site: name/firm <br />Notes: <br />/ performed nuclear field density tests as requested by Ty Hyatt of material being placed for fill at the new drain on the <br />RPEE. Ty showed the technician the area that was prepared and ready for testing. Lambert and Associates' technician <br />chose the test locations within the area that was ready for testing. Please refer to the these results sheets for <br />approximate test locations and test results. The test results indicate only the relative compaction and soil moisture <br />content of the material tested at the elevation and location tested at the time of our site visit. <br />Lambert and Associates Technician: Hayes <br />