Laserfiche WebLink
The former pits will be completely filled so there will be no standing water. Runoff will <br />generally occur as sheet flow although two channels will be constructed that will route water to <br />the sediment pond from the west side of the B -Pit and from the south and east side of the former <br />permit area. Due to the deep eolian sand deposits over the CEC site and the sand's high <br />infiltration characteristics at this site, there are significant losses to deep percolation of rainfall <br />during major storm events. All continuing water needs for dust suppression will be obtained <br />from the permitted on-site domestic well LFH #1 (Permit No. 048289-F) <br />107 06/16 <br />