Laserfiche WebLink
COLOR.A.DO DISZSION OF REC'L_A-ALITION,IIIN'LCC=kND UTTY <br /> 1313 Shesmxn Street,Room 215,Dearer,Colmado 80203 ph(303)S66-3567 <br /> REQUEST FOR TECHNICAL REVESIO:'y t"TR)COVER SHEET <br /> FileNo.:Nl- 1993-05 Site Name:Midwestern Farms Pit <br /> County Powers TR# /D VUS Use ont <br /> Perrmittee:Midwestern Farms <br /> operator(IfotherthanPermittee):Eastern Colorado Aggregate (ECA) <br /> Permittee Representative:David A. King <br /> Please provide a brief description of the proposed revision: <br /> Reduce depth of top soil,eliminate tree planting,eliminate wetland planting,change post <br /> -rniningtanc# 4Wd#eupland;fangebnd,-mWfec-reation.inaeasevze -__....__ <br /> maximum disturbed area to 463.2 acres. <br /> As defined by the Minerals Rules.a Technical Revision(TR.) is:"a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR- <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit_ <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Divisions(as listed below by permit type)_ Please submit the appropriate fee with your request to <br /> expedite the revieiv process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days.If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> penmittee requests additional time,in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR-,however.it is up to the peruuttee to provide <br /> sufficient information to the Division to approve the TR request,including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> }row request for a Technical Revision- <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 110c, 111, 112 construction <br /> materials,and 112 quarries S216 f <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1,2 or 3) $1006 ❑ <br />