Laserfiche WebLink
CREEK MINJ <br />2016 SEEDING <br />16 -Left -- Hydro -seed slope on northeast corner of pad and collection ditch (0.75 acre) <br />Pond T — Broadcast seed ditch repair area (0.25 acre) <br />Coal Refuse Pile — Drill or hydro -seed bench slope (3.0 acres) <br />Train Loadout Slope Repair — Hydra -seed repair area (1.5 acre - deferred) <br />5 -Main North -- Broadcast or hydro -seed pad outslopes (0.75 acre) and drill -seed pipeline <br />disturbance (1.5 acres) <br />10 -Right Pipeline — Drill -seed pipeline redisturbance (6.0 acres) <br />Barricade Chamber — Broadcast seed erosion control areas (2.0 acres) <br />Fish Creek Tipple — Reseed (drill) ditch and slope repair areas (0.75 acre) <br />9 -East — Broadcast seed pad outslopes and soil stockpile(s) (2.0 acres) <br />Miscellaneous Soil Stockpile and Weed Control Areas — Broadcast or hydro -seed (3.5 acres) <br />Exploration Boreholes — Drill seed 5 pad areas (0.25 acres each) and reseed (drill) 8 pad areas (0.25 <br />acres each) <br />