Laserfiche WebLink
Page 88 of 176 <br />BULLDOZER WORK <br />Task description: Backfill SDH -3 Dewatering Treatment System <br />Site: Deserado Mine Permit Action: 2017 Midterm Review Permit/Job#: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 068 State: Colorado <br />Date: 1/12/2017 County: Moffat <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/flour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Abbreviation: None <br />Filename: C018-068 <br />$97.48 <br />Utilization % <br />NA <br />$103.60 <br />100 <br />$10.74 <br />NA <br />$6.60 <br />100 <br />$38.89 <br />NA <br />$257.31 <br />$257.31 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,450 <br />Swell factor: 1.250 <br />Loose volume: 1,813 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />75 feet <br />1,514.3 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push 0% <br />gradient: <br />Average site altitude: 5,450 feet <br />Material weight: 2,550 lbs/LCY <br />Weight description: Earth - <br />CIRCES Cost Estimating Software <br />