Laserfiche WebLink
Task description: <br />Site: Deserado Mine <br />PROJECT IDENTIFICATION <br />BULLDOZER WORK <br />TS#2 Sediment Pond <br />Permit Action: 2017 Midterm Review <br />Task #: 064 State: Colorado <br />Date: 1/11/2017 County: Rio Blanco <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/flour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Page 79 of 176 <br />Permit/Job#: C1981018 <br />Abbreviation: None <br />Filename: C018-064 <br />$97.48 <br />Utilization % <br />NA <br />$103.60 <br />100 <br />$10.74 <br />NA <br />$0.00 <br />0 <br />$38.89 <br />NA <br />Total unit Cost/Hour: $250.71 <br />Total Fleet Cost/Hour: $1,002.84 <br />MATERIAL OUANTITIES <br />Initial Volume: 161 <br />Swell factor: 1.111 <br />Loose volume: 179 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />11111.71 d 9 M)111LO Y (1X11 <br />C-1981-018, TS #2 Sediment Pond <br />Operator Study <br />Average push distance: 65 feet <br />Unadjusted hourly 1,752.8 LCY/hr <br />production: <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push 0% <br />gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />5,300 feet <br />2,743 lbs/LCY <br />User Provided <br />CIRCES Cost Estimating Software <br />