Laserfiche WebLink
Truck Cvcle Time: <br />Truck Exchange Time: 0.60 Minutes <br />Truck Load Time: 1.600 Minutes <br />Truck Maneuver and Dump 1.00 Minutes <br />Time: <br />Adjusted for site altitude: <br />Adjusted for site altitude: <br />Adjusted for site altitude: <br />Page 56 of 176 <br />0.600 <br />Minutes <br />1.600 <br />Minutes <br />1.000 <br />Minutes <br />Truck Travel (Haul & Return) Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, <br />maintained 3.0 <br />Grade (%) <br />Roll. Res <br />Total Res <br />Haul Route: <br />Travel <br />Loading Tool unit <br />Seg # <br />Haul Distance <br />Grade (%) <br />(%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />310.41 <br />(Ft) <br />257.64 LCY/Hour <br />Optimal No. of Trucks: <br />(%) <br />(%) <br />(fpm) <br />Time <br />2000.00 <br />3.00 <br />3.00 <br />6.00 <br />2851 <br />0.929 <br />LCY/Hour <br />min <br />LCY/Hour <br />JOB TIME AND COST <br />1 <br />2000.00 <br />-3.00 <br />1 <br />3.00 <br />0.00 <br />4254 <br />0.945 <br />/LCY Total job cost: $3,568 <br />Haul Time: <br />0.945 <br />minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />310.41 <br />LCY/Hour Adjusted for job efficiency: <br />257.64 LCY/Hour <br />Optimal No. of Trucks: <br />min <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />1 <br />2000.00 <br />3.00 <br />3.00 <br />6.00 <br />2851 <br />0.929 <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 0.929 <br />minutes <br />Total Truck Cycle Time: 5.074 <br />minutes <br />Loading Tool unit <br />Production <br />715.91 <br />LCY/Hour Adjusted for job efficiency: <br />594.20 LCY/Hour <br />Truck Unit Production <br />310.41 <br />LCY/Hour Adjusted for job efficiency: <br />257.64 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 515.27 <br />LCY/Hour <br />Adjusted single truck/loader team production: 515.27 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 515.27 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 7.12 <br />Hours <br />Unit cost: <br />$0.972 <br />/LCY Total job cost: $3,568 <br />CIRCES Cost Estimating Software <br />