Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: Remove Parking Lot and Access Road Pavement <br />Site: Deserado Mine Permit Action: 2017 Midterm Review Permit/Job#: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 042 State: Colorado <br />Date: 1/11/2017 County: Rio Blanco <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Cat 770D <br />-Loader: CAT 980H <br />Abbreviation: None <br />Filename: CO 18-042 <br />Shift basis: 1 per day <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Truck/Loader Team Sunnort Eauinment Maintenance Eauinment <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: 100 <br />90 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: $83.44 <br />$53.90 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: $69.85 <br />$57.56 <br />NA <br />NA <br />NA <br />NA <br />%Utilization -riper: NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: $22.10 <br />$38.60 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: $175.39 <br />$150.05 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: 2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: Work: $500.83 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $500.83 <br />MATERIAL OUANTITIES <br />Initial volume: 3,671 CCY Swell factor: 1.000 <br />Loose volume: 3,671 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />