My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-26_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2017-01-26_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2017 10:29:10 AM
Creation date
1/26/2017 10:06:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
1/26/2017
Doc Name
Midterm Review & Findings & Cost Estimate
From
DRMS
To
Blue Moutain Energy, Inc
Type & Sequence
MT7
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 43 of 176 <br />COMPACTION WORK <br />Task description: Compact Refuse at RP 2/3/4, 5a, and Facilities Area Refuse <br />Site: Deserado Mine Permit Action: 2017 Midterm Review Permit/Job#: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 029 <br />Date: 1/11/2017 <br />User: JDM <br />State: Colorado <br />County: Rio Blanco <br />Abbreviation: None <br />Filename: C018-029 <br />Agency or organization name: DRMS <br />feet <br />4.00 <br />HOURLY EQUIPMENT COST <br />10.00 <br />inches <br />Basic Machine: Deleted - CAT 815F <br />(5,280ft./12in./27cu.ft.) <br />Horsepower: 240 <br />Compactor Type: Soil - tamping foot <br />1,412.67 <br />Shift Basis: 1 per day <br />Site Altitude: <br />5,300 feet <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$52.96 <br />NA <br />Operating Cost/Hour: <br />$65.23 <br />100 <br />Operator Cost/Hour: <br />$34.94 <br />NA <br />Total Unit Cost/Hour: <br />$153.13 <br />Total Fleet Cost/Hour: <br />$153.13 <br />MATERIAL OUANTITIES <br />Loose volume: 380,000 LCY Shrinkage factor: 0.870 <br />Compacted volume: 330,600 CCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated shrinkage factor: Cat Handbook <br />1010 t1l a'd 9:11111110 Y CI],I <br />Compacted width per pass (W): <br />Average Compactor Speed (S): <br />Compacted thickness of each lift (L): <br />Conversion Constant (C): <br />Required number of machine passes (P): <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Unadjusted hourly production = (W x S x L x C) / P <br />6.50 <br />feet <br />4.00 <br />mph <br />10.00 <br />inches <br />16.3 <br />(5,280ft./12in./27cu.ft.) <br />3 <br />passes <br />1,412.67 <br />CCY/hour <br />Site Altitude: <br />5,300 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.8300 multiplier <br />Adjusted Hourly Unit Production: 1,172.51 CCY/Hour <br />Adjusted Hourly Fleet Production: 1,172.51 CCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Compactor(s) <br />Unit cost: $0.131 per CCY <br />Total job time: <br />281.96 Hours <br />Total job cost: $43,176 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.