Laserfiche WebLink
Page 40 of 176 <br />TRUCK/LOADER TEAM WORK <br />Task description: Haul Temporary Refuse from Facilities Area to RP -5a <br />Site: Deserado Mine Permit Action: 2017 Midterm Review Permit/Job#: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 028 State: Colorado <br />Date: 1/11/2017 County: Rio Blanco <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Cat 770D <br />-Loader: CAT 980H <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C018-028 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $842.02 <br />MATERIAL OUANTITIES <br />Initial volume: 48,333 CCY Swell factor: 1.000 <br />Loose volume: 48,333 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Study <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />Truck Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 75 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$83.44 $53.90 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$69.85 $47.96 <br />NA <br />NA <br />NA <br />NA <br />%Utilization -riper: <br />NA 0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA $0.00 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA $0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$22.10 $38.60 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$175.39 $140.46 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />4 1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $842.02 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $842.02 <br />MATERIAL OUANTITIES <br />Initial volume: 48,333 CCY Swell factor: 1.000 <br />Loose volume: 48,333 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Study <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />