Laserfiche WebLink
Task description: <br />Site: Deserado Mine <br />Page 34 of 176 <br />SCRAPER TEAM WORK <br />Cover RP2/3/4 with Subsoil <br />Permit Action: 2017 Midterm Review Permit/Job#: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 025 State: Colorado <br />Date: 1/11/2017 County: Rio Blanco <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Abbreviation: None <br />Filename: C018-025 <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraper Work Team Support Eauipment Maintenance Eauipment <br />Total work team cost/hour: $2,251.92 <br />MATERIAL OUANTITIES <br />Initial volume: 124,264 CCY Swell factor: 1.111 <br />Loose volume: 138,057 LCY <br />Source of estimated volume: C-1981-018 Permit Volume IV <br />Source of estimated swell factor: Operator Study <br />h[I 111 R ala 9 till 110 Y [IN <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$148.54 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$192.54 <br />NA <br />NA <br />NA <br />NA <br />NA <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$34.24 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$375.32 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />6 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$2,251.92 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $2,251.92 <br />MATERIAL OUANTITIES <br />Initial volume: 124,264 CCY Swell factor: 1.111 <br />Loose volume: 138,057 LCY <br />Source of estimated volume: C-1981-018 Permit Volume IV <br />Source of estimated swell factor: Operator Study <br />h[I 111 R ala 9 till 110 Y [IN <br />Material weight: <br />2,743 lbs/LCY <br />Material description: <br />User Provided <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />29.75 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />