Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Recontouring the Haul Road/County Road 65 Intersection <br />Site: Deserado Mine Permit Action: 2017 Midterm Review Permit/Job#: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 010 State: Colorado <br />Date: 1/11/2017 County: Moffat <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C018-010 <br />COSTShift basis: 1 per day <br />iption <br />Cost Breakdown: Scraner Work Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $361.22 <br />MATERIAL OUANTITIES <br />Initial volume: 3,900 CCY Swell factor: 1.060 <br />Loose volume: 4,134 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$139.29 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$187.69 <br />NA <br />NA <br />NA <br />NA <br />NA <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$34.24 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$361.22 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$361.22 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $361.22 <br />MATERIAL OUANTITIES <br />Initial volume: 3,900 CCY Swell factor: 1.060 <br />Loose volume: 4,134 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />3,250 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Gravel - Pitrun <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />25.11 LCY <br />Adjusted Capacity: <br />25.11 <br />LCY <br />CIRCES Cost Estimating Software <br />