Laserfiche WebLink
this is an unoccupied dwelling, no waiver is required. <br />2.03.8 Permit Term Information <br />NHN began mine development in 2012. Mining of coal started in mid -2013. <br />Mining is expected to terminate by the end of 2020. The total area within the mine <br />permit is 328.88 acres. <br />2.03.9 Personal Injury and Property Damage Insurance Information <br />This information is included as Appendix 2.03.9-1. <br />2.03.10 Identification of Other Licenses & Permits Pertinent to Surface Coal Mining <br />FEDERAL <br />Mine Safety and Health Administration (MSHA) <br />Mine I.D. Number: 05-00299 from MSHA District #9 <br />U.S. Army Corps of Engineers (USACOE) <br />Nationwide General Permit No. 21 - Surface Coal Mining Activities (Section 404) <br />Federal Communications Commission (FCC) <br />NHN has been assigned a frequency of 151.775 MHz and a call sign of WPGP927 <br />Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF) <br />NHN will not store, transport or use explosives. All blasting will be done by a <br />licensed contractor. <br />STATE <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />Mining and Reclamation Permit No. C-2010-089 <br />Effective: June 20, 2012 <br />Colorado Department of Public Health and Environment <br />Air Pollution Control Division <br />Air Pollution Permit No. IOMO2275F <br />Effective: February 11, 2015 <br />Section 2.03 Page 2.03-17 September 2016 (SO -01) <br />