Laserfiche WebLink
• <br />STORM KING MINES, <br />Initial Approval <br />Page 2 <br />INC. <br />Permit 84GA323 -7 <br />3. This source shall be limited to a maximum raw coal throughput rate of <br />540 tons /hour and 2.95 million tons /year, and all other activities, <br />operational rates, and numbers of equipment as stated in the application. <br />4. Daily and annual records.of raw coal processed shall be maintained by <br />the applicant and made available to the Division for inspection upon <br />request. <br />5. This permit number shall be clearly marked on each separable major <br />component of the equipment for ease of identification. <br />6. This source is subject to Colorado and Federal New Source Performance <br />Standard Requirements of Regulation No. 6, Subpart B, Section XXIII, <br />which limits emissions of particulate to 20% opacity, and emission rate <br />of 47.6 lbs. /hour. <br />7. The expiration date for this permit is October 12, 1986 <br />(See General Permit Condition No. 6, Item (1) on reverse of this permit). <br />• <br />BY: 4 A <br />Te—vi96 Engineer <br />u <br />By: <br />ection Chief <br />Engineering Section <br />Stationary Sources Program <br />Air Pollution Control Division <br />