My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-02_PERMIT FILE - C1984065A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1984065
>
2016-12-02_PERMIT FILE - C1984065A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 10:28:10 AM
Creation date
1/24/2017 9:49:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065A
IBM Index Class Name
Permit File
Doc Date
12/2/2016
Doc Name
and Exhibits
Section_Exhibit Name
2.0 Legal, Financial, Compliance and Related Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />COLORADO D <br />Air Pollution Control Division <br />\* 1 X, �E�p�M�0 <br />� 1876 <br />OF HEALTH <br />Telephone: (303) 320 -4180 <br />EMISSION PERMIT <br />PERMIT NO. 85GA335 (1) INITIAL APPROVAL <br />DATE ISSUED: December 24, 1985 FINAL APPROVAL ❑ <br />ISSUED TO: NEW CASTLE ENERGY CORPORATION <br />THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS <br />FOLLOWS: <br />Underground coal mining operation located south of I -70 <br />between New Castle and Glenwood Springs, Garfield County, <br />Colorado. <br />THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE <br />FOLLOWING: <br />One Sullair Model 250, serial 1143 -5014, 300 HP diesel <br />fired compressor engine. <br />THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE <br />COLORADO AIR QUALITY CONTROL COMMISSION AND THE COLORADO AIR QUALITY <br />CONTROL ACT C.R.S. 1973 (25-7 -101 at sec.), TO THOSE GENERAL TERMS AND <br />CONDITIONS SET FORTH ON THE REVERSE SIDE OF THIS DOCUMENT AND THE <br />FOLLOWING SPECIFIC TERMS AND CONDITIONS: <br />1. Visible emissions shall not exceed. 202 opacity. <br />2. The permit number shall be clearly marked on the subject equipment for <br />ease of identification. <br />3. Construction of this source must commence within 18 months of initial <br />approval permit issuance or within 18 months of the start -up -date <br />stated in the application. If commencement does not occur within <br />• the stated time frame the permit will expire on <br />(See General Condition No. 6., Item 1 on the reverse side of the first <br />page of this permit). <br />continued... <br />
The URL can be used to link to this page
Your browser does not support the video tag.