Laserfiche WebLink
LIST OF FIGURES <br /> (continued) <br /> Figure No. Ewe <br /> 13-2 Typical Road Cut .................................................................................................. 14 <br /> 13-3 Typical In-Wash Culvert ......................................................................................19 <br /> 13-4 Typical Cross-Drain Culvert ............................................................................... 20 <br /> 13-5 Typical Access Road Section .............................................................................. 24 <br /> 13-6 Typical Light Use Road Section ......................................................................... 30 <br /> LIST OF ATTACHMENTS <br /> Attachment No. <br /> 13-1 General Hydrology Design Methods <br /> 13-2 Diversions <br /> 13-3 Design Report Sediment Structure Pond 010 <br /> 13-3A As-Built Report Sediment Structure Pond 010 <br /> 13-4 Design Report Sediment Structure Pond 011 <br /> 134A As-Built Report Sediment Structure Pond 011 <br /> 13-5 Geotechnical Investigation - Haul Roads Y-A and Y-B, and Pond 010 <br /> 13-6 Geological Report for Haul Roads A and B <br /> 13-6A Ground Stability Investigation, Yoast Mine and Vicinity <br /> 13-7 Haul Road Ditch Designs <br /> 13-8 Culvert Calculations <br /> 13-9 Light-Use Roads - Generic Culvert Calculations <br /> 13-10 650 Dragline Deadhead Route <br /> 13-11 Haul Road Construction Summaries <br /> 13-12 Drainage and Sediment Control Plan <br /> 13-12A.1 As-Built Report Sediment Structure Pond 012 (Option 1 - without Pond 012A) <br /> 13-12A.2 As-Built Report Pond 012 (Option 2 - with Pond 012A) <br /> 13-12B Pond 012 Landslide Repair Plan and Subsequent Slope Stability Analysis <br /> 13-13 Sedimentation Pond 012 Stability Analysis <br /> 13-14 Haul Road B Extension Instability Investigation <br /> 13-15 Sedimentation Pond 013 & 014 Stability Analysis <br /> 13-16 Haul Road D Stability Analysis <br /> 13-17 As-Built Report Sedimentation Structure Pond 014 <br /> 13-18 Sedimentation Pond 011A Stability Analysis <br />TR-40 TOC-ii Revised 02/09