Laserfiche WebLink
COST SUMMARY WORK <br />Task description. Permit Renewal No. 6 Task Summar <br />Site. Seneca II -W 'Mine Permit Action: RN <br />PROJECT IDENTIFICATION <br />Task 11 000 State: Colorado <br />Date 2/3/2016 County ROU[t <br />User. JHB <br />Agency or organization name DRMS <br />TASK LIST (DIRECT COSTS) <br />Tas1, I <br />Description <br />UlU Doze Adjacent South Wad, -,e Pit Spoil Rides <br />020 Rip Facilities Aiea <br />029 Grade Culvert Embankments <br />0.0 Grade Haul Roads to Blend <br />035 Finish Grade All Mine Areas <br />038 Post Mine Drainage <br />039 Re, -,rade Pond 009 <br />040 <br />041 <br />0-12 <br />043 <br />045 <br />050 <br />051 <br />054 <br />057 <br />058 <br />059 <br />060 <br />061 <br />069 <br />070 <br />073 <br />07: <br />07-1 <br />075 <br />076 <br />083 <br />Permit/Job#: CI982057 <br />Abbreviation: None <br />Filename: C057-000 <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />DOZER <br />RIPPER <br />DOZER <br />GRADER <br />GRADER <br />NA <br />DOZER j <br />4 <br />2 <br />4 <br />l <br />1 <br />1 <br />131.76 <br />110.63 <br />9.49 <br />54.40 <br />81.60 <br />25.62 <br />125.00 <br />Replace Topsoil from Stockpile I to Shop and <br />Explosive Site <br />Re,rade Pond 015 <br />DOZER <br />j Reurade Pond 016 <br />DOZER <br />Regrade Pond 016a -completed but not bond <br />released <br />DOZER <br />Re,iade Pond 017 <br />DOZER <br />Backtill and Reatade All Ditches <br />GRADER <br />Replace Topsoil from Stockpile I to Shop and <br />Explosive Site <br />SCRAPERI <br />Replace Topsoil Itom Stockpile I to Road A <br />I SCRAPERI <br />Replace Topsoil fironn Stockpile to Flail Road I <br />SCRAPERI <br />Replace Topsoil from Stockpile BB to Road A <br />SCRAPERI <br />Replace To soil from Stockpile to Raod A <br />SCRAPERI <br />Replace Topsoil from Stockpile BB to Final Pit <br />Area <br />SCRAPERI <br />I Replace "Topsoil Brom Stockpile C to Final Pit Area <br />I SCRAPERI <br />Replace Topsoil from Stockpile FF to Final Pit <br />Aiea <br />SCRAPERI <br />i <br />Replace Topsoil from Stockpile TT to Permanent <br />Road J <br />j SCRAPERI <br />I Replace Topsoil from Stockpile UU to Permanent <br />Road I <br />SCRAPERI <br />Replace Topsoil fiom Stockpile WW to Final Pit <br />Ai ea <br />I SCRAPERI <br />j <br />Replace Topsoil from Stockpile XX to Final Pit <br />Area <br />i SCRAPERI <br />Replace Topsoil from Stockpile YY to Haul Road <br />L <br />SCRAPERI <br />i <br />Replace Topsoil fiom Stockpile YY to Final Pit <br />Area <br />SCRAPERI <br />Replace Topsoil from Stockpile ZZ to Final Pit <br />Area <br />! SCRAPERI <br />Replace Topsoil from Stockpile AAA to Final Pit <br />Area <br />SCRAPERI <br />1 3 1 76 <br />1 31.76 <br />1 64.48 <br />1 29.33 <br />1 6.40 <br />1 42.25 <br />2 31.41 <br />2 3b.04 <br />2 <br />2 35.43 <br />2 21.33 <br />2 46.22 <br />2 6 92 <br />2 16.53 <br />2 8.58 <br />2 52.06 <br />2 j 81.13 <br />2 j <br />90.68 <br />271 8.82 <br />I <br />2 74.10 <br />2 105.04 <br />Cost <br />$337.340.00 <br />$10,=152.00 <br />$116,70700 <br />$11,407.00 <br />$3,582.00 <br />$44,405.70 <br />$8,330.00 <br />$8.330 00 <br />$8,330.00 <br />$16,911.00 <br />$7,693.00 <br />$89600 <br />$39,807.00 <br />$53,942.00 <br />$61,886.00 <br />$3,27500 <br />$60,843.00 <br />$36,635.00 <br />$79,377.00 <br />SI 1,879 00 <br />$28,387.00 <br />$1=4,732.00 <br />S89,411 00 <br />$139.33700 <br />$155.731.00 <br />$13 5.3 66.00 <br />$127.264.00 <br />$180,392.00 <br />CIRCES Cost Estimating Sotnware <br />