My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-17_HYDROLOGY - M1988112 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2017-01-17_HYDROLOGY - M1988112 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2020 1:49:33 PM
Creation date
1/23/2017 10:45:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Date
1/17/2017
Doc Name
Water Monitoring - Groundwater
From
Battle Mountain Resources
To
DRMS
Annual Report Year
2016
Report Quarter_Month
Dec
Email Name
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. <br /> January 09, 2017 RECEIVED <br /> , 4AN 172017 <br /> DWION OF RECLAMATION <br /> MINING AND SAFETY <br /> Mr.Wally Erickson <br /> State of Colorado <br /> Division of Reclamation,Mining and Safety <br /> 1313 Sherman Street,Room 215 <br /> Denver,CO 80203 <br /> Re: Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No.M-88-112 <br /> v December 2016 Monthly Report <br /> Dear Mr. Erickson: <br /> The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. (BMRA <br /> San Luis Project for the month of December 2016. <br /> Surface and ground water monitoring and analysis were completed for all required sites during the month <br /> per the terms and conditions of the TR-32 Quality Assurance and Quality Control(QA/QC)plan. <br /> Vacuum on the tailing lysimeters was verified on December 30ffi, no water was present for sampling and <br /> subsequent analysis. <br /> Depths to water were collected for the tailing impoundment main embankment piezometers and the West <br /> Pit monitoring wells on December 30`h. The December tailing impoundment piezometer measurements <br /> identified these installations were either dry or contained less than 12 inches of water as illustrated in <br /> Table 2. Tables 1 and 2 below identify the depth to water measurements collected for each of the site <br /> monitoring wells, piezometers and lysimeters as required by the terms and conditions of the TR-32 <br /> QA/QC plan. <br /> The leak detection system was measured on December 30`h. A total of 760 gallons of water was excavated <br /> from the leak detection system yielding a monthly average of 25.3 gpad.The tailings pond under-drain <br /> measured 37.5 gpm. <br /> During the month of December,the West Pit water treatment plant operated efficiently discharging a total <br /> of 6,749,200 gallons(20.71 acre-feet)of water to Rito Seco Creek and a total of 456,600 gallons(1.40 <br /> acre-feet)of water was transferred from the West Pit to the tailings impoundment. Seepage along Rito <br /> Seco Creek remained dry during the month. <br /> P.O.Box 310 - San Luis,Colorado 81152-0310 - (719)379-0798 - Fax(719)379-0713 <br /> ^r <br />
The URL can be used to link to this page
Your browser does not support the video tag.