My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-18_INSPECTION - M1992069
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1992069
>
2017-01-18_INSPECTION - M1992069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2020 2:11:19 PM
Creation date
1/19/2017 7:49:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992069
IBM Index Class Name
INSPECTION
Doc Date
1/18/2017
Doc Name
Corrective Action Documentation
From
Aggregate Industries
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Boyd Irrigation Company <br /> February 2, 2006 <br /> Aggregate Industries <br /> Attn.: Connie Davis <br /> P.O. Box 337231 <br /> Greeley, Colorado 80633 <br /> Re: Boyd-Freeman Ditch Replacement at F Street(Hill) Property <br /> Dear Connie; <br /> This letter is to confirm your discussion with Tracy Kittell on January 31, 2006 in <br /> regards to the installation of pipe in place of an open ditch for a section of the Boyd- <br /> Freeman Ditch. It is my understanding that a portion of the ditch needs to be placed in a <br /> pipe instead of an open ditch due to space restrictions that will not allow a stable ditch <br /> section plus an access road. The section of the ditch you are proposing to pipe starts at <br /> the upstream end of the 30-inch diameter concrete pipe that has recently been installed <br /> under the railroad bridge and continues approximately 1300 feet upstream at a 0.2% <br /> grade. The contractor is proposing to use corrugated, smooth bore polyethylene pipe. If <br /> any of this is incorrect please let me know as soon as possible. <br /> Since pipe is going to be used in place of an open ditch there are several items <br /> that need to be addressed for construction: <br /> 1. To convey 11 cubic feet per second (cfs), City of Greeley's prorate portion <br /> of the ditch decree, the pipe diameter will need to be 24-inches <br /> (Attachment 1). The City would like to reserve the ability to convey up to <br /> 20 cfs which would require 30-inch diameter pipe. The City is willing to <br /> reimburse Aggregate Industries for the pipe material cost difference <br /> between 24-inch and 30-inch diameter pipe per the City's over-sizing <br /> policy. <br /> 2. The pipe needs to be installed per the attached Trench Cross-Section <br /> Detail and Trenching, Backfilling, and Compaction specification. <br /> 3. Six foot diameter Manholes will need to be installed approximately every <br /> 400 feet and at horizontal alignment changes for maintenance purposes. <br /> Manholes need to be installed per the attached Manhole details and <br /> specifications. <br /> 4. The connection to the existing concrete pipe needs to be accomplished <br /> using a cast-in-place concrete box with a poured channel. The box needs <br /> to be reinforced and a manhole cover shall be installed in the roof of this <br /> structure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.