My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-18_INSPECTION - M1992069
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1992069
>
2017-01-18_INSPECTION - M1992069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2020 2:11:19 PM
Creation date
1/19/2017 7:49:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992069
IBM Index Class Name
INSPECTION
Doc Date
1/18/2017
Doc Name
Corrective Action Documentation
From
Aggregate Industries
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water and Sewer Department <br /> 1100 I&Street,P Floor•Greeley,CO 80631 •(970)350-9818 <br /> C4 of <br /> ar'eft <br /> March 13,2006 <br /> Connie N. Davis <br /> Land Resources Assistant <br /> Aggregate Industries—WCR, Inc. <br /> P.O. Box 337231 <br /> Greeley,CO 80633 <br /> Re: Boyd-Freeman Ditch Replacement at F Street(Hill)Property <br /> Dear Connie: <br /> In response to your March 3,2006 letter regarding relocation of the Boyd-Freeman Ditch <br /> through the Hill Property,please consider this letter as the City's authorization to conduct the <br /> additional work necessary to upgrade piping from 15-inch to 30-inch across the Hill property <br /> and to invoice the City(send the invoices to my attention) for the costs of the upgrade. <br /> The City will reimburse Aggregate Industries for the upgrade based on an approximate cost <br /> of$38,211 (difference between$78,847 for 30-inch pipe and$40,636 for 15-inch pipe). This <br /> reimbursement is based on the assumption that Aggregate Industries will warrant the <br /> completed work for one year after construction completion. <br /> Please notify me prior to commencing construction and if it appears that the costs for the <br /> upgrade will increase significantly. <br /> Thank you for your collaboration on this project and please do not hesitate to contact me at <br /> (970)350-9818 if you have any issues. <br /> Sincerely, <br /> jot <br /> Martin Howell, P.E. <br /> Water Resource Administrator II <br /> cc: Stuart Larman,P.E. Water&Sewer Engineering and Planning Manager <br /> S L a v I N G OUR COMMUNITY I T ' s A TRADITION <br /> �e promise to praserue andimproue lie 9ually o`/le for.9reeky lSmuySi limey, courleous anal cos!eecliue service. <br />
The URL can be used to link to this page
Your browser does not support the video tag.