Laserfiche WebLink
March 3,2006 I;� <br /> Mr.Martin Howell,President AGGREGATE <br /> Boyd Irrigation Company INDUSTRIES <br /> c/o Greeley Water& Sewer Department <br /> 1100 10" Street, Suite 300 <br /> Greeley,CO 80631 <br /> Re: Boyd-Freeman Ditch Replacement at F Street(Hill)Property <br /> Dear Martin: <br /> In response to your letter of February 2,2006 regarding Aggregate Industries' relocation of the <br /> Boyd-Freeman Ditch through the above-referenced property,Aggregate Industries(AI)would <br /> first clarify that its responsibility for ditch replacement is limited to constructing a ditch which <br /> will deliver historic capacity. <br /> Prior to recent up-stream ditch improvements,the Boyd Freeman Ditch entered the Hill F Street <br /> property through a 15-inch culvert on the west boundary of the property,and the extents of the <br /> Boyd Freeman Ditch which flowed through the Hill F Street property were narrow, shallow open <br /> ditches capable of carrying no more than the flows passing into the property through the 15-inch <br /> pipe. A lateral off of the main ditch flowed north and exited the property approximately 1100 <br /> feet east of the west boundary of the Hill F Street property. The main ditch flowed south,then <br /> east to the east end of the property,then north. The ditch exited at the northeast corner of the <br /> property,flowed through a small wood box culvert under the railroad and north onto what is now <br /> the LaFarge mining operation through another culvert pipe under a road north of the railroad. <br /> AI's open ditch replacement was designed based on the historical information noted above. <br /> When Al became aware that an open ditch replacement could not accommodate an access road <br /> for approximately the last 1300 feet to the new outlet structure recently installed by the City of <br /> Greeley,it was determined that a pipe would be required along this section. Based upon the <br /> historical 15-inch inlet at the west property boundary,Al was prepared to install a 15-inch pipe; <br /> however,based upon the size of the City's new outlet structure,Al requested a meeting with <br /> Tracey Kittell on January 31 to determine if the City would prefer to upgrade to a 24-inch pipe. <br /> According to your February 2 letter,the City would like to upgrade the pipe to a 30-inch diameter <br /> and proposes to reimburse Al for the pipe material cost difference between 24-inch and 30-inch <br /> diameter pipe. While AI understands the desire of the City to accommodate greater ditch flows, <br /> all costs associated with improvements to the ditch through the Hill F Street property to <br /> Aggregate industries <br /> West Central Region, Inc. Connie N.Davis,Land Resources <br /> 1707 Cole Blvd, Suite 100 P.O.Boa 337231,Greeley,CO 80633 <br /> Golden, CO 80401 (970)336-6526 <br /> Telephone:303-985-1070 An Equal Opportunity Employer <br />