Laserfiche WebLink
Table 3. Summary of Applicable SL -10 Bond Release Amounts — West Pit <br />Task <br />Cost <br />Doze Remaining West Pit Highwall <br />$ <br />242,194.00 <br />Doze Remaining West Pit Hi hwall <br />$ 3,660,532.00 <br />Load and Haul Spoil to West Pit <br />$ <br />485,491.00 <br />Rip Remaining West Pit Hi hwall <br />$ <br />122,204.00 <br />Finish Grade West Pit <br />$ <br />148,086.00 <br />Excavate Regraded Areas forPost-miningDrainage Channels <br />$ <br />45,578.00 <br />"Mine" Riprap from South Taylor Pit Stockpiles <br />$ <br />174,397.00 <br />Regrade East Taylor Pond <br />$ <br />5,171.00 <br />Regrade West Pit Pond <br />$ <br />14,417.00 <br />Remove and Regrade East TaylorPond Ditch <br />$ <br />1,667.00 <br />Remove and Regrade West Pit Coal Road Ditch <br />$ <br />2,188.00 <br />Haul Topsoil fromPile 4AtoWestPit <br />$ <br />127,369.00 <br />Haul Topsoil fromPile 15B to WestPit <br />$ <br />409,026.00 <br />Haul Topsoil fromPile 15KtoWestPit <br />$ <br />75,996.00 <br />Haul Topsoil fromPile 16AtoWestPit <br />$ <br />96,167.00 <br />Haul Topsoil fromPile 16E to WestPit <br />$ <br />34,314.00 <br />Haul Topsoil fromWindrow 5 to West Pit <br />$ <br />33,387.00 <br />Replace Topsoil from Stockpile to East Taylor Pond <br />$ <br />1,614.00 <br />Replace Topsoil from Stockpile toWestPitTaylor Pond <br />$ <br />2,943.00 <br />Reseed West Pit with Grazing Land Seed Mix <br />$ <br />622,391.00 <br />Reseed West Pit with Sagebrush Steppe SeedMix <br />$ <br />161,388.00 <br />Reseed East TaylorPondwith Grazing Land Seed Mix <br />$ <br />937.00 <br />Reseed West Pit Pond with Grazing Land Seed Mix <br />$ <br />1,709.00 <br />Weed Control -10% of Reseeded Areas Four Times <br />$ <br />42,729.00 <br />Mobilize/Demobilize Equipment <br />$ <br />236,792.00 <br />Site Maintenance During TenYearLiabifity Period <br />$ <br />76,039.00 <br />Subtotal of directcosts (roundedto nearestdollar) <br />$ 6,824,726.00 <br />Indirect Costs (rounded to nearest dollar) <br />$ 1,323,157.00 <br />Total Amount <br />$ 8,147,883.00 <br />Applicable Amount (-1%) <br />$ <br />118,839.00 <br />Total Bond Releas e Amount (15 % ofApplicable Amount) <br />$ <br />16,776.00 <br />Proposed Decision and Findings of Compliance January 2017 <br />Partial Phase III Bond Release SL -10 Page 12 <br />