My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-13_REPORT - M1977252
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977252
>
2017-01-13_REPORT - M1977252
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 3:45:54 PM
Creation date
1/13/2017 3:24:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977252
IBM Index Class Name
Report
Doc Date
1/13/2017
Doc Name
Annual Fee/Report/Map
From
General Shale Brick, Inc.
To
DRMS
Annual Report Year
2017
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REcENED <br />JAN 13 2010 <br />DIVliNk L,r MiCLAM T10N <br />F REP MAF RAS <br />(DRMS Office Use Only) <br />112c Annual Report <br />Permit Number: <br />Permittee Name: <br />Operation Name: <br />County: <br />M-1977-252 <br />General Shale Brick, Inc. <br />Pioneer Mine <br />Douglas <br />Anniversary Date: January 13, 2017 <br />Current Bond Amt: $91,243.00 <br />Annual Fee Due: <br />$791.00 <br />Permit Acreage: <br />34.00 <br />DRMS Specialist <br />PSH <br />Page 3 of 5 <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required monitoring <br />information, reclamation accomplished to date and during the preceding year, any new disturbance that is anticipated to <br />occur during the upcoming year, any reclamation that will be performed during the upcoming year, the dates for the <br />beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1)? YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2)? NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? - <br />5. Does the mine operate more than 180 days per year? YES NO <br />If "NO", please review Rule I.13 to assure that your mine is in compliance. — <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES O <br />b) approval for INTERMITTENT OPERATION? YES <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation): <br />8. Number of acres that were newly affected during the current report year: <br />9. Number of acres that were reclaimed during the current report year: <br />I0. Estimated new acreage to be affected in the next report year: <br />11. Estimated acres to be reclaimed in the next report year: <br />
The URL can be used to link to this page
Your browser does not support the video tag.