Laserfiche WebLink
December 30, 2016 C-1981-008/New Horizon Mine BFB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 3 <br /> <br />GENERAL MINE PLAN COMPLIANCE: <br /> Soil was pushed aside to create a well drill site approximately 75’ north of BB Road and just east of the <br />CCC West Lateral 12” pipeline (photo 4). The well site appears to be on ERMR’s property according to Map <br />2.03.4-1 Surface Ownership and Leases and Map 2.05.3(3)-3 Utility Location. Monitoring wells were permitted <br />to be installed in TR-74. <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br /> <br />PHOTOGRAPHS <br /> <br /> Photo 1 – Northwest Part of Mine Photo 2 – Ponds 9 and 12 <br /> Photo 3 – Pond 18 Photo 4 – Monitoring Well Site <br />Pond 13 <br />Pond 16 <br />Soil Pushed Against <br />Embankment <br />Pond 9 <br />Pond 12