My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-10_REPORT - M1977132
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977132
>
2017-01-10_REPORT - M1977132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2020 6:59:10 AM
Creation date
1/11/2017 9:01:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977132
IBM Index Class Name
REPORT
Doc Date
1/10/2017
Doc Name
Annual Fee/Report/Map
From
Oldcastle SW Group
To
DRMS
Annual Report Year
2017
Email Name
THM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: 3 seeded w/ w/topsoil mulched w/ <br /> approved mix: replaced: a roved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> replacement y rate tons/ac : 2�/graded: fertilized w/ p ( ) �qCr <br /> apvd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application application HYX0 application <br /> method: Q method: method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? YE NO N/A <br /> If"YES", indicate the weed species, control area, control type, application rate and treatment ate on the report map. <br /> 14. Is adequate topsoil reserved for reclamation,based on your approved permit? (f:s� NO N/A <br /> If"NO",please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO N/A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of tha State <br /> Engineer(Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO N/ <br /> 17. Are all hazardous materials stored within approved spill containment structures? � NO N/A <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? YES NO N/A <br /> 19. Is your basis for legal right to enter still valid? dESD NO <br /> 20. Does your permit require you to submit monitoring information annually? YES VOj N/A <br /> If"Yes", please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S.34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: <br />
The URL can be used to link to this page
Your browser does not support the video tag.