Laserfiche WebLink
CMC <br /> Continental Materials Corporation <br /> Transit Mix Concrete Co. 440 S. LaSalle St. Suite 3100 <br /> Chicago IL 60605 <br /> even distribution of water and solids across the face of the embankment and not create a point where <br /> any one area will be overloaded which could encourage embankment failure. <br /> Pumping Plan during Transition Time <br /> Once the existing Wash Fines Pond has reached capacity and the proposed Wash Fines Pond permit <br /> revision has been approved,deposition of the wash fines will be transferred from the existing location <br /> to the proposed location.TMCC will continue to pump the standing water off of the existing pond, <br /> recycling it back to the processing plant, in an effort to speed up the drying process of the solids left <br /> behind. It will take up to 6 months to pump down the remaining standing water. Once the standing <br /> water is removed and the solids are dried out, reclamation will begin. <br /> Res ectfully, <br /> J r Id Schnabel, President <br /> Transit Mix Concrete Co. <br /> Agent for Continental Materials Corporation <br />