My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-23_INSPECTION - M2001018
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2001018
>
2016-12-23_INSPECTION - M2001018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2017 10:33:00 AM
Creation date
1/6/2017 10:16:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001018
IBM Index Class Name
Inspection
Doc Date
12/23/2016
Doc Name
Inspection Report
From
DRMS
To
Neinhueser Construction & Excavating Co
Inspection Date
12/15/2016
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> <br />Task description: Cost Estimate, December 15, 2016 Inspection <br />Site: Schumacher II Permit Action: Dec. 2016 Inspection Permit/Job#: M2001018 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 12/22/2016 County: Logan Filename: M018-000 <br />User: JLE <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Grade Slopes DOZER 1 8.30 $1,387.00 <br />002 Spread topsoil over the affected area SCRAPER1 1 3.10 $2,077.00 <br />003 Rip access road RIPPER 1 0.31 $54.00 <br />004 Revegetation of Affected Area REVEGE 1 1.95 $4,048.00 <br />005 Mobilization MOBILIZE 1 3.96 $5,727.00 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />17.62 <br /> <br />$13,293 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $268.52 <br />Performance bond: 1.05 Total = $139.58 <br />Job superintendent: 8.81 Total = $656.17 <br />Profit: 10.00 Total = $1,329.30 <br /> TOTAL O & P = $2,393.57 <br /> CONTRACT AMOUNT (direct + O & P) = $15,686.57 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 0.00 Total = $0.00 <br />Reclamation management and/or administration: 5.00 $784.33 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br />TOTAL INDIRECT COST = $3,177.90 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $16,470.90 <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.