Laserfiche WebLink
Description Cost /Acre <br />Drill Seeding (DRMS Survey Cost) $232.00 <br /> <br />Total Seed Application Cost/Acre <br />$232.00 <br /> <br />MULCHING and MISCELLANEOUS <br />Materials <br /> <br />Description <br />Units / <br />Acre <br /> <br />Unit <br /> <br />Cost / Unit <br /> <br />Cost /Acre <br />Straw, delivered {MEANS 31 25 14.16 1200} 2.00 TON $246.00 $492.00 <br /> <br />Total Mulch Materials Cost/Acre <br /> <br /> <br /> <br /> <br /> <br /> <br />$492.00 <br />Application <br /> <br />Description <br /> <br />Cost /Acre <br />Crimping, with tractor {DMG survey data} $66.02 <br /> <br />Total Mulch Application Cost/Acre <br />$66.02 <br /> <br />NURSERY STOCK PLANTING <br /> <br />Common Name <br />No / <br />Acre Type and Size Planting <br />Cost <br />Fertilizer <br />Pellet Cost <br /> <br />Cost /Acre <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />$ <br />Totals Nursery Stock Cost / Acre <br /> <br />$0.00 <br /> <br />JOB TIME AND COST <br />No. of Acres: 3.9 Cost /Acre: $975.85 <br />Estimated Failure Rate: 20% Cost /Acre*: $310.24 <br />*Selected Replanting Work Items: SEEDING <br />Initial Job Cost: $3,805.82 <br />Reseeding Job Cost: $241.99 <br />Total Job Cost: $4,048 <br />Job Hours: 1.95 <br /> <br />