Laserfiche WebLink
<br /> <br />SCRAPER TEAM WORK <br /> <br />Task description: Spread topsoil over the affected area <br />Site: Schumacher II Permit Action: Dec. 2016 Inspection Permit/Job#: M2001018 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 002 State: Colorado Abbreviation: None <br />Date: 12/22/2016 County: Logan Filename: M018-002 <br />User: JLE <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> <br /> Equipment Description <br />-Scraper: Cat 627G w/push-pull <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: CAT 12M <br />Road Maintenance –Motor Grader: NA <br />-Water Truck: NA <br /> <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 NA NA 100 NA NA <br />Ownership cost/hour: $105.55 NA NA $26.66 NA NA <br />Operating cost/hour: $146.13 NA NA $35.34 NA NA <br />%Utilization-ripper: NA NA NA NA NA NA <br />Ripper own. cost/hour: NA NA NA $0.00 NA NA <br />Ripper op. cost/hour: NA NA NA $0.00 NA NA <br />Operator cost/hour: $34.24 NA NA $35.83 NA NA <br />Unit Subtotals: $285.92 NA NA $97.83 NA NA <br />Number of Units: 2 0 0 1 0 0 <br />Group Subtotals: Work: $571.84 Support: $97.83 Maint: $0.00 <br />Total work team cost/hour: $669.67 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 3,148 CCY Swell factor: 1.000 <br />Loose volume: 3,148 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br /> Scraper Bowl (volume) Basis: <br />Material weight: 1,600 lbs/LCY Struck Volume: 15.70 LCY <br />Material description: Top Soil Heaped Volume: 22.00 LCY <br />Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br />Payload Capacity: 33.00 LCY Adjusted Capacity: 18.85 LCY