Laserfiche WebLink
7. Coal Handlin Structures <br /> New Horizon has no existing or proposed coal handling structures. The coal from the mine pit is <br /> hauled in highway trucks to the power plant for processing and use. <br /> 8. Support Facilities and Utility Installations <br /> All support facilities used in connection with the operation of the mine, including but not limited <br /> to, mine buildings, equipment storage facilities, sheds, shops and other buildings will be <br /> designed, constructed or reconstructed and located to minimize or control erosion and siltation, <br /> water pollution and damage to public or private property. <br /> Services which run through pass over, or under the permit area, consisting of power, sewage, <br /> water, and telephone lines, and wells will be protected against damage or relocated to prevent or <br /> minimize the disruption of service. <br /> 9. Irrigation� System <br /> An electric irrigation pump is located in Calamity Draw, near Pond 007. It pumps water into an <br /> aluminum or PVC pipe system that distributes water to several side roll sprinkler systems. A <br /> second irrigation pump station has been established along the north permit boundary to furnish <br /> additional irrigation water to the irrigation system, see Map 2.05.3(3)-1 for locations. This <br /> irrigation system will enhance the revegetation on the irrigated pastureland portion of the final <br /> reclamation. <br /> All information on topsoil and overburden stockpiles are given in Section 2.05.4. <br /> 10. Roads <br /> A two track road and a section of the BB Detour road that provides access to the CCC Ditch <br /> head gate will remain as a permanent feature and will not be reclaimed. The surface <br /> landowner's letters approving retention of this road can be found in Attachment 2.05.3(3)-17. <br /> R. Special Features <br /> 1. Pit Turn Slot Cut(January 2016—No Longer Applicable) <br /> A 115 feet wide slot cut is needed on the east side of 2700 Road as mining proceeds north to the <br /> outcrop from the year 2000-2003. The west slope of the slot cut will be near vertical since it will <br /> be a highwall. The east slope of the slot cut will be the angle of repose of the backfill, which is <br /> Page 2.05.3(3)-41 November 2016 (MR-103) <br />