My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-23_PERMIT FILE - C1981008A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2016-11-23_PERMIT FILE - C1981008A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2017 10:33:51 AM
Creation date
1/6/2017 9:32:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
11/23/2016
Doc Name
Mine Facilities
Section_Exhibit Name
Section 2.05.3(3) Table of Contents & Mine Facilities
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2.05.3(3)-3 <br /> Timing of Road, Ditch, and Utility Detours and Restorations <br /> Item Description Date <br /> 1 Construct BB Road Detour 2000 <br /> 2 Installed 26" and 12"pipeline to divert West Lateral Ditch around the 2002 <br /> active mine area east of 2700 Road <br /> 3 Installed a portion of the 26" HDPE pipe into its permanent location in 2003 <br /> Section 1 (west of 2700 Road to end of pipeline- Morgan field) <br /> 4 Construct BB/2700 Detour Road to Morgan, Enstrom, Johnson, Wilcox 2003 <br /> 5 Extended the temporary 12" HDPE pipeline further into Section 36 to 2006 <br /> service James Johnson <br /> 6 Abandon the temporary 12" HDPE pipeline to Johnson property. No 2007 <br /> longer needed since WFC exercised its lease agreement. <br /> 7 Bury the 26 " and 12" HDPE pipeline into its permanent location in 2007 <br /> Section 31 and connect it to the already permeant 26" pipe in Section I to <br /> completely finish the entire pipeline project. <br /> 8 Finish building 2700 and BB East Road to final graveled grade. The road 2008 <br /> was opened for Public use and BB Detour Road was closed. Pavement <br /> still needs to be completed for project is finalized. <br /> 9 Pave 2700 Road and BB Road in original locations and restore Sunshine 2010 <br /> Ranch Corner intersection. <br /> 10 Remove BB Road detour and reclaim road area 2009 <br /> 11 Mine west to last cut at western permit boundary 2013 <br /> 12 Backfill final cut with overburden stockpile 2015 <br /> 13 Retopsoil and revegetate final cut area 2018 <br /> 14 Replace BB Road from Sunshine Ranch Corner to western boundary. 2015 <br /> 15 Continue to irrigate and monitor reclaimed areas until final bond release. 2015 - Bond <br /> Release <br /> As of PR-08, the Sunshine ranch intersection has been restored but paved. The BB Road Detour <br /> will be reclaimed by the end of 2009, except for the portion on the Benson east property, which <br /> will remain at the request of the landowner. A letter from the landowner certifying his desire for <br /> the road to remain can be found in Attachment 2.05.3(3)-8. A section of BB Road Detour road to <br /> the CCC Ditch head gate will also be retained at the request of the landowner. Please see <br /> Section Q Support Facilities, Item 10 Roads. All county road construction has been completed <br /> and approved by Montrose County. <br /> Page 2.05.3(3)-38 November 2016 (MR-103) <br />
The URL can be used to link to this page
Your browser does not support the video tag.