My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-23_PERMIT FILE - C1981008A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2016-11-23_PERMIT FILE - C1981008A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2017 10:33:51 AM
Creation date
1/6/2017 9:32:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
11/23/2016
Doc Name
Mine Facilities
Section_Exhibit Name
Section 2.05.3(3) Table of Contents & Mine Facilities
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Drainage <br />Each haul road not within areas disturbed by mining and reclamation activities will be designed, <br />constructed and maintained to have adequate drainage using ditches and culverts to safely <br />convey the peak runoff from a 10 -year, 24-hour precipitation event while maintaining a <br />minimum of one half foot of freeboard to the top of the road embankment (see Map 2.05.3(3)-1 <br />for typical details of drainage structures). <br />Drainage ditches will be placed at the toe of all cut slopes formed by the construction of haul <br />roads. Water will be intercepted before reaching a large fill and drained safely away in <br />accordance with the requirements of 4.03.1. Water from a fill will be released below the fill <br />through conduits or in adequately lined channels and will not be discharged onto the fill. <br />When drainage ditches discharge onto open terrain, a number of measures will be taken to <br />protect the terrain from erosion. When the drainage discharges onto a disturbed area, the area <br />will be revegetated to control runoff. In an area where revegetation would not be sufficient to <br />control erosion, the area will be rip -rapped. Temporary measures to reduce erosion will be <br />employed while the area is undergoing revegetation such as straw dikes, containment ditches, <br />etc. New Horizon typically constructs ditches on the inside of roadway cuts and safety berms for <br />drainage. As most road cuts are into resistant bedrock -type material, ditches normally do not <br />require lining. Culverts will be designed and installed to minimize the runoff volume conveyed <br />in each ditch. Culverts and ditches will typically be designed using SEDCAD or other generally <br />accepted software to predict the peak runoff and Manning's equation to determine the peak <br />velocity and flow depth. <br />If the ditch is not stable, then New Horizon will use a larger ditch section and/or adequately line <br />the ditch in order to comply with applicable regulations. <br />Drainage from haul roads within the areas disturbed by mining and reclamation activities (see <br />Map 2.05.3(3)-1 ) will be constructed to meet the requirements of 4.05.2 and such haul roads will <br />at a minimum be constructed and maintained to minimize erosion of the disturbed area. Erosion <br />control measures to be used singly or in combination include but are not limited to: <br />a. Stabilizing all exposed surface areas to promote a reduction in the rate and <br />volume of runoff, <br />b. Using straw dikes, riprap, check dams, berms, geotextile materials, mulches, <br />vegetation sediment filters, contour furrows or other measures that reduce <br />overland flow velocity, reduce runoff volume, or trap sediment; or <br />Page 2.05.3(3)-22 January 2016 (TR -70) <br />
The URL can be used to link to this page
Your browser does not support the video tag.