My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-23_PERMIT FILE - C1981008A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2016-11-23_PERMIT FILE - C1981008A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2017 10:33:51 AM
Creation date
1/6/2017 9:32:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
11/23/2016
Doc Name
Mine Facilities
Section_Exhibit Name
Section 2.05.3(3) Table of Contents & Mine Facilities
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Sedimentation Ponds 008 throush 018 Design Parameters <br />In accordance with Rule 4.05.2, Ponds 007 through 018 will be used to prevent, additional <br />contributions of sediment to stream flow or runoff outside the permit area due to mining <br />disturbance. Pond 011 has been fully reclaimed and some of the drainage area that was <br />previously to be handled by these ponds is now handled by Pond 013. The pond designs and or <br />run-off calculations for the sedimentation ponds are shown below: <br />Pond <br />Attachment <br />Maps <br />Pond 007 <br />Attachment 2.05.3(3)-2 <br />Map 2.05.3(3)-2-1 and Map 2.05.3(3)-2-2 <br />Pond 008 <br />Attachment 2.05.3(3)-4 <br />Map 2.05.3(3)-4-1 and Map 2.05.3(3)-4-2 <br />Pond 009 <br />Attachment 2.05.3(3)-5 <br />Map 2.05.3(3)-5-1 <br />Attachment 2.05.3(3)-30 <br />Attachment 2.05.3(3)-30, Map 1 <br />Pond 011 <br />Attachment 2.05.3(3)-20 <br />Map 2.05.3(3)-14 <br />Pond 012 <br />Attachment 2.05.3(3)-12 <br />Map 2.05.3(3)-12-1 <br />Attachment 2.05.3(3)-13 <br />Map 2.05.3(3)-12-2 <br />Attachment 2.05.3(3)-31 <br />Map 2.05.3(3)-12-3 <br />Map 2.05.3(3)-12-4 <br />Attachment 2.05.3(3)-31, Map I <br />Pond 013 <br />Attachment 2.05.3(3)-6 <br />Map 2.05.3(3)-6-1 <br />Attachment 2.05.3(3)-21 <br />Attachment 2.05.3(3)-32, Map 1 <br />Attachment 2.05.3(3)-32 <br />Pond 014 <br />Attachment 2.05.3(3)-11 <br />Map 2.05.3(3)-11 <br />Pond 015 <br />Attachment 2.05.3(3)-22 <br />Map 2.05.3(3)-15 <br />Attachment 2.05.3(3)-24 <br />Map 2.05.3(3)-19 <br />Attachment 2.05.3(3)-33 <br />Attachment 2.05.3(3)-33, Map 1 <br />Pond 016 <br />Attachment 2.05.3(3)-29 <br />Attachment 2.05.3(3)-29, Map 1 <br />Attachment 2.05.3(3)-29, Map 2 <br />Pond 018 <br />Attachment 2.05.3(3)-28 <br />Attachment 2.05.3(3)-28, Map 1 <br />Attachment 2.05.3(3)-28, Map 2 <br />Attachment 2.05.3(3)-28, Map 3 <br />Ponds 007 and 008 are the only ponds that will remain after reclamation. Pond 013 will remain <br />for some time after the reclamation of the surrounding land but will not be permanent. The <br />demonstration to allow retention of Pond 007 is Attachment 2.05.3(3)-16. The demonstration to <br />allow retention of Pond 008 is Attachment 2.05.3(3)-19. Map 2.05.3(3)-1 shows the locations of <br />the as -built and yet -to -be built ponds. Pond 014 was the post -mine conversion of the pre -mine <br />SAE #2. It was reclaimed along with the BB detour road and no longer exists as of April 2010. <br />The sedimentation ponds are designed, constructed, and maintained as follows: <br />a. Ponds 008, 009, 012, and 013 have been designed to contain the 25 year 24 hour <br />event with no discharge from the emergency spillway. Ponds 015, 016 and 018 <br />have been designed for a 100 -year 24-hour event with no discharge. Due to their <br />small drainage area and completely incised impoundment, there are no <br />embankments to fail, so only run-off volume calculations have been performed. <br />Page 2.05.3(3)-12 January 2016 (TR -70) <br />
The URL can be used to link to this page
Your browser does not support the video tag.