My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-04_REVISION - C1981041 (7)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2017-01-04_REVISION - C1981041 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2017 9:13:01 AM
Creation date
1/6/2017 8:21:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
1/4/2017
Doc Name
Concurrence Correspondence
From
OSM
To
DRMS
Type & Sequence
SL9
Email Name
JHB
JRS
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tO,"T %>yF, United States Department of the Interior <br />A�w <br />OFFICE OF SURFACE MINING <br />Reclamation and Enforcement <br />Western Region Office <br />1999 Broadway, Suite 3320 <br />Denver, CO 80202-3050 <br />JAN 0 4 2017 <br />Mike Boulay, Director <br />Office of Mined Land Reclamation <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Approval of SL -9 Phase II and III Bond Release, Roadside Mine, Permit No. C-1981- <br />041 <br />Dear Mr. Boulay, <br />This letter acknowledges the Office of Surface Mining Reclamation and Enforcement (OSMRE), <br />Denver Field Division (DFD) receipt and review of the above Phase II and III Bond Release <br />Proposed Decision document prepared by the Division of Reclamation Mining and Safety <br />(DRMS) dated November 23, 2016. The Proposed Decision documents the applicant's <br />compliance with the approved Colorado regulatory program at Rule 3.03.2. The Division is <br />concurrently processing a bond reduction in the amount of $44,985.57 due to its recent <br />recalculation of the required reclamation liability amount. <br />DRMS's proposed decision approves 2.8 acres of Phase II, 10.3 acres of Phases n and III, and <br />0.5 acres of Phase III bond release. This bond release applies to portions of the Roadside Mine <br />northeast of Palisade, Colorado. OSMRE participated in the bond release inspection held on <br />October 6, 2016. The Bureau of Land Management did not participate in the inspection. By <br />letter dated December 6, 2016, the BLM provided its concurrence with the SL -9 bond release <br />(attached). OSMRE interprets the BLM's concurrence to mean the Roadside Mine is in <br />compliance with all BLM coal lease stipulations. The BLM's concurrence letter indicates a <br />$97,202.20 reduction in liability. This number includes the $52,216.63 proposed for bond release <br />under SL -9 in addition to the $44,985.57 bond reduction amount which not is subject to the <br />procedures of Rule 3.03.2. Therefore the BLM number differs from the amount listed for bond <br />release in the Division's findings and decision documents as well as in this concurrence letter <br />from OSMRE. <br />OSMRE agrees with DRMS that Snowcap Coal Company, Inc. has met or exceeded the <br />requirements for Phase II and/or III bond release on the specified 13.6 acres of land as described <br />in DRMS Proposed Decision document. The Division currently holds a performance bond in the <br />amount of $805,952.60 for the Roadside Mine. DRMS proposes to release $52,216.63 with this <br />bond release action ($6,415.15 less than the amount Snowcap Coal Company requested). <br />OSMRE agrees with the findings and decision document and hereby provides OSMRE <br />concurrence for the above bond release action in accordance with 30 CFR 740.15 (d) (3), and 30 <br />CFR 906.30, Article IX, Section 24, of the State -Federal Cooperative Agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.