Laserfiche WebLink
SW_N218 <br />CONTENTS: RESULTS OF MONTHLY FIELD TESTS and QUARTERLY TESTING, <br />FLOW RATE CALCULATIONS, and FLOW RATE HYDROGRAPH <br />Monthly Field Tests <br />Quarterly Tests <br />Surface Water Quality Parameters <br />SITE: SW -N218 <br />N1613452 E2091369 <br />LOCATION SAN MIGUEL RIVER STARTED SAMPLING MARCH OF 2012 <br />BELOW COAL CANYON <br />Date of Collection 16 -Oct -15 19 -Nov -15 8 -Dec -15 15 -Jan -16 11 -Feb -16 28 -Mar -16 13 -Apr -16 24 -May -16 22 -Jun -16 29 -Jul -16 24 -Aug -16 28 -Sep -16 <br />FIELD PARAMETERS <br />PH <br />871 <br />844 <br />862 <br />ICE 836 <br />850 <br />853 <br />839 <br />830 <br />8 64 <br />865 <br />871 <br />Water Temperature (deg C) <br />153 <br />24 <br />1 7 <br />12 <br />74 <br />136 <br />113 <br />173 <br />242 <br />21 6 <br />189 <br />Conductivity(umhos/cm) <br />748 <br />1341 <br />1023 <br />1000 <br />537 <br />366 <br />404 <br />285 <br />763 <br />932 <br />973 <br />Approximate Instantaneous Flow (cfs) <br />110 <br />90 <br />ICE <br />ICE ICE <br />265 <br />750 <br />1,000 <br />1,100 <br />160 <br />150 <br />105 <br />FROM USGS, URAVAN GAGE <br />LABORATORY PARAMETERS <br />Metals Analysis <br />MDUS Units <br />Iron, dissolved (mg/l.) <br />0 02(B) <br />0 02(B) <br />005 <br />0 02(B) <br />002 mat <br />Iron, total <br />096 <br />043 <br />206 <br />409 <br />002 mat <br />Manganese, total <br />0 125 <br />0 059 <br />0 134 <br />0 189 <br />00050 mat <br />Wet Chemistry <br />Acidity as CaCO3 <br />U <br />U <br />U <br />U <br />10 mat <br />Conductivity @25C <br />1130 <br />831 <br />395 <br />906 <br />1 umhos/cm <br />pH (lab) <br />85(H) <br />84(H) <br />83(H) <br />86(H) <br />01 SU <br />Residue, Filterable (TDS) @180 <br />874 <br />642 <br />258 <br />698 <br />10 mat <br />Residue, Non-Fitlerable (TSS) <br />31 <br />13(B) <br />72 <br />164 <br />5 mat <br />I Neg.W. (-) = less than <br />2 U=-tdetectedet MDL(A4nmum Detection Level) <br />3 H -Exceeded hold Mire <br />4 B = Ana" concentra6an detected at a value Dantean MDL and POL <br />(Appends 2 05 6(3}3, January 2012) THIS SITE WILL BE MONITORED FOR 4 QUARTERS BEFORE MINING TAKES PLACE <br />& 4 QUARTERS BEFORE RECLAMATION BOND RELEASE <br />M \EMS\New Honzon North\Enwmnmental\5 0 WQCD\5 1 COPS Pennd\2016\2016_NHN_AHR <br />