My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-28_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2016-12-28_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 1:14:20 PM
Creation date
1/4/2017 12:51:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
12/28/2016
Doc Name
Memo /Cost Estimate
From
Jason Musick
To
Brock Bowles
Type & Sequence
SL18
Email Name
BFB
DIH
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip BB Detour Rd Topsoil -Slash M <br />Site: New Horizon Mine Permit Action: SL18 Permit/Job#: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 81B State: Colorado Abbreviation: None <br />Date: 12/28/2016 County: Montrose Filename: C008 -81B <br />User: JDM <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU Horsepower: 405 <br />Ripper Attachment: 1 -Shank Ripper Shift Basis: I per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />$97.48 <br />Utilization % <br />NA <br />$103.60 <br />100 <br />$12.31 <br />NA <br />$7.10 <br />100 <br />$38.89 <br />NA <br />Ownership Cost/Hour: <br />NA <br />Operating Cost/Hour: <br />Area: <br />Ripper Ownership Cost/Hour: <br />Ripper Operating Cost/Hour: <br />3.00 <br />Operator Cost/Hour: <br />Average Ripping Width: <br />Total Unit Cost/Hour: <br />$259.38 <br />Total Fleet Cost/Hour: $259.38 <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />Selected estimating method: Area <br />Seismic: NA Bank Volume: <br />Area: 1.50 acres Rip Depth (ft): <br />Source of estimated quantity: Opera <br />HOURLY PRODUCTION <br />Seismic: <br />NA <br />3.00 <br />estimate <br />BCY NA <br />Volume: 7,260 BCY or CCY <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />3.00 <br />mph <br />Average Ripping Width: <br />6.08 <br />degrees <br />Average Ripping Length: <br />150.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.643 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.643 <br />Acres/hr <br />Site Altitude: <br />5,700 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.53 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.53 <br />Acres/hr <br />
The URL can be used to link to this page
Your browser does not support the video tag.