My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-04_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2017-01-04_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 9:57:08 AM
Creation date
1/4/2017 12:03:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
1/4/2017
Doc Name
Annual Geotechnical Inspection Report
From
Newmont / CC&V
To
DRMS
Annual Report Year
2015
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■■Ne Fief <br />0 Perspective. Vision. Solutions. <br />December 15, 2015 <br />NewFields Project 475.0106.001 <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />100 North P Street <br />Victor, Colorado 80860 <br />Attention: Chris Hanks <br />Chief Environmental Coordinator <br />RE: 2015 Annual Arequa Gulch Valley Leach Facility Inspection <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Vidor, Teller County, Colorado <br />Dear Chris, <br />NewFields Mining and Technical Services (NewFields) has prepared this letter report for Cripple <br />Creek & Victor Gold Mining Company (CC&V) presenting the results of the annual inspection of <br />the Arequa Gulch Valley Leach Facility (AG -VLF) conducted on October 22 and November 3, <br />2015 by Mssrs. R. Michael Smith and Jay Janney -Moore. <br />The primary objectives of the AG -VLF inspection included: <br />t Assess the settlements cracks that are being observed along an access road on the north <br />side of the pad, within the limits of Phase 4; <br />Assess the overall stability of the AG -VLF including the ore slopes, foundation, and internal <br />solution ponds; <br />D Verify the operation of the AG -VLF is in accordance with the project design criteria; and <br />Evaluate the AG -VLF underdrain flow and water quality with respect to AG -VLF containment <br />performance <br />This letter report presents observations made during the site inspection, data provided by <br />CC&V in support of the inspection program, and NewFields' conclusions based on the <br />inspection results. <br />1. SETTLEMENT CRACKS <br />NewFields was called to inspect some cracks that had developed in an access road on the north <br />side of the pad. The cracks started developing in October 2015, after a 100' high ore lift had <br />
The URL can be used to link to this page
Your browser does not support the video tag.