My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-03_INSPECTION - M2007013 (2)
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2007013
>
2017-01-03_INSPECTION - M2007013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 11:40:18 AM
Creation date
1/4/2017 10:36:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007013
IBM Index Class Name
Inspection
Doc Date
1/3/2017
Doc Name
Inspection Report
From
DRMS
To
McAtee Construction Company
Inspection Date
12/19/2016
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br /> <br />Task description: Spread Topsoil <br />Site: Bollish Pit #2 Permit Action: Dec. 2016 Inspection Permit/Job#: M2007013 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 002 State: Colorado Abbreviation: None <br />Date: 1/3/2017 County: Logan Filename: M013-002 <br />User: JLE <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> <br /> Equipment Description <br />-Scraper: Cat 627G w/push-pull <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: CAT 140M <br />-Water Truck: NA <br /> <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 NA NA NA 100 NA <br />Ownership cost/hour: $105.55 NA NA NA $36.00 NA <br />Operating cost/hour: $146.13 NA NA NA $40.02 NA <br />%Utilization-ripper: NA NA NA NA NA NA <br />Ripper own. cost/hour: NA NA NA NA $0.00 NA <br />Ripper op. cost/hour: NA NA NA NA $0.00 NA <br />Operator cost/hour: $34.24 NA NA NA $35.83 NA <br />Unit Subtotals: $285.92 NA NA NA $111.85 NA <br />Number of Units: 2 0 0 0 1 0 <br />Group Subtotals: Work: $571.84 Support: $0.00 Maint: $111.85 <br />Total work team cost/hour: $683.69 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 7,260 CCY Swell factor: 1.000 <br />Loose volume: 7,260 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br /> Scraper Bowl (volume) Basis: <br />Material weight: 1,600 lbs/LCY Struck Volume: 15.70 LCY <br />Material description: Top Soil Heaped Volume: 22.00 LCY <br />Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br />Payload Capacity: 33.00 LCY Adjusted Capacity: 18.85 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.