My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-04_REVISION - M1979102
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979102
>
2017-01-04_REVISION - M1979102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:13 PM
Creation date
1/4/2017 8:12:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979102
IBM Index Class Name
Revision
Doc Date
1/4/2017
Doc Name
Request for Technical Revision
From
Cross Mountain Ranch
To
DRMS
Type & Sequence
TR2
Email Name
ACY
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,a <br />4C <br />e� <br />i &1W„ COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />• fele s * 1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866-3567 <br />REQUEST FOR TECHNICAL REVISION R COVER SHEET <br />RFile No.: M-1979-102 Site Name: Kagie Gravel Pit <br />CountyRoutt TR# tDRMS Use orrh <br />Permittee:Cross Mountain Ranch <br />Operator (If Other than Permittee):Routt County RECEIVED <br />Permittee Representative:Stacy Quick JAN 0 4 2017 <br />DMSION OF RECLAMATION <br />Please provide a brief description of the proposed revision: „MINING noun SA► <br />addition of weed management plan <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan.” The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. if at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type Required TR Fee Submitted (mark only one) <br />I IOc, 111, 112 construction <br />materials, and 112 quarries $216 ✓ <br />112 hard rock (not DMO) <br />I IOd, 112d(l, 2 or 3) <br />$175 ❑ <br />$1006 ❑ <br />J Annual Fee/Report: cw <br />J Violations: <br />MV -2005-043 10/22 /2005 <br />VA 11/21/2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.