Laserfiche WebLink
was determined that the total disturbance area of the applicable bond release is 12.27 acres. The <br />12.27 acres consist of 29 boreholes and six associated roads. <br /> <br />Evaluation and inspection of the reclaimed areas was based on the specific requirements of the <br />reclamation plan and the functional requirements of the post-mining land use. Criteria for Phase I <br />Bond Release included the following (if applicable). <br /> <br />1. Hillslope and drainage channel gradients and general design compliance; <br />2. Performance of the reconstructed topography. Symptoms of failure or instabilities such as <br />slumping or exposed highwalls were examined; <br />3. Hillslope design/function with regard to erosion; <br />4. Swales and depressions with regard to numbers of features and effect on post-mining land <br />use; <br />5. Blending of regraded land to undisturbed areas; <br />6. The functioning of drainages with regard to knick-points, blending at disturbance <br />boundaries and channel erosion; <br />7. Erosional features; and <br />8. Drainage control; for the reclaimed area, including upslope diversions. <br /> <br />The Bowie No. 2 Mine’s reclamation plan was prepared in accordance with Rule 2.05.4. <br /> <br />PREVIOUSLY RELEASED SITES <br /> <br />In addition to the disturbances associated with this SL-02 bond release application, a number of <br />coal exploration sites have been bonded under the Bowie No. 2 Mine which were previously <br />released under a Notice of Intent to Explore bond release approval. These sites will be removed <br />from the Bowie No. 2 Mine liability as a part of this SL-02 bond release. The sites to be <br />removed are identified in Table 4. <br /> <br />III. OBSERVATIONS AND FINDINGS <br /> <br />The bond release inspection for this bond release application was conducted on November 1, 2016. <br />During the inspection, the methane drainage well pads and road disturbance associated with SL-02 <br />were visually assessed for compliance with pertinent Phase I requirements. Relevant <br />documentation developed over the life of the operation, including information from operator annual <br />reports and prior Division inspection reports, has also been utilized in the compliance evaluation. <br />Such documentation is referenced in this section as appropriate. <br /> <br />The inspection review for SL-02 included a review of all drillhole abandonment reports associated <br />with methane drainage wells requested to be released under SL-02. During the SL-02 bond release <br />inspection, noxious or invasive vegetation management issues were noted on several disturbed areas <br />and are referenced in the Division’s inspection report. No maintenance issues were noted that <br />would prevent the release of the requested areas inspected. <br /> <br /> <br />