Laserfiche WebLink
The Division's current calculated reclamation liability is $2,164,901. SPL has posted a Financial <br />Warranty Corporate Surety issued by Lexon Insurance Company in the amount of $2,221,677.26 <br />effective April 1, 2016. <br />MAP DESCRIPTION <br />Map IA - Phase I Bond Release SL -6 Area Delineation Map. This map shows all requested <br />Phase I areas. <br />Map 1 B - Phase III Bond Release SL -6 Area Delineation Map. This map shows all requested <br />Phase III areas. The Phase III areas meet the minimum 10 year period for <br />revegetation <br />Map 2 — Phase I and III Bond Release SL -6 Permanent Features Map. This map shows <br />permanent features documented in the mine permit. <br />Map 3 - Post Mining Topography Map. This map can be compared to the pre -mining <br />topography map for elevation comparisons <br />Map 4 — Phase I and III Bond Release SL -6 General Location Map. This map shows the <br />general location of the Yoast Mine property boundaries relative to other land marks. <br />BOND RELEASE DOCUMENTATION <br />This application represents a formal request for partial Phase I Bond Release on 94.9 acres and <br />partial Phase III Bond Release on 277.2 acres (BRB-1) of reclaimed lands at the Yoast Mine (see <br />Maps IA & 1B). These reclaimed lands comply with applicable success and demonstration <br />criteria set forth in Rule 4 — Performance Standards and the approved Yoast permit. <br />SUMMARY OF RECLAMATION AND MANAGEMENT HISTORY <br />PHASE I RELEASE AREAS <br />The majority of the Phase I request areas have been included in previous bond release submittals <br />and were either excluded from the submittal or rescinded back to Phase I due to slope instability. <br />Map IA breaks the requested Phase I area down into parcels which are then identified by <br />SL -6 - 4 <br />