My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-28_REVISION - C1994082 (8)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2016-12-28_REVISION - C1994082 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2017 12:00:05 PM
Creation date
1/3/2017 8:08:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
12/28/2016
Doc Name
Application
From
Seneca Property, LLC
To
DRMS
Type & Sequence
SL6
Email Name
JDM
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Division's current calculated reclamation liability is $2,164,901. SPL has posted a Financial <br />Warranty Corporate Surety issued by Lexon Insurance Company in the amount of $2,221,677.26 <br />effective April 1, 2016. <br />MAP DESCRIPTION <br />Map IA - Phase I Bond Release SL -6 Area Delineation Map. This map shows all requested <br />Phase I areas. <br />Map 1 B - Phase III Bond Release SL -6 Area Delineation Map. This map shows all requested <br />Phase III areas. The Phase III areas meet the minimum 10 year period for <br />revegetation <br />Map 2 — Phase I and III Bond Release SL -6 Permanent Features Map. This map shows <br />permanent features documented in the mine permit. <br />Map 3 - Post Mining Topography Map. This map can be compared to the pre -mining <br />topography map for elevation comparisons <br />Map 4 — Phase I and III Bond Release SL -6 General Location Map. This map shows the <br />general location of the Yoast Mine property boundaries relative to other land marks. <br />BOND RELEASE DOCUMENTATION <br />This application represents a formal request for partial Phase I Bond Release on 94.9 acres and <br />partial Phase III Bond Release on 277.2 acres (BRB-1) of reclaimed lands at the Yoast Mine (see <br />Maps IA & 1B). These reclaimed lands comply with applicable success and demonstration <br />criteria set forth in Rule 4 — Performance Standards and the approved Yoast permit. <br />SUMMARY OF RECLAMATION AND MANAGEMENT HISTORY <br />PHASE I RELEASE AREAS <br />The majority of the Phase I request areas have been included in previous bond release submittals <br />and were either excluded from the submittal or rescinded back to Phase I due to slope instability. <br />Map IA breaks the requested Phase I area down into parcels which are then identified by <br />SL -6 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.