My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-23_REVISION - M1981207
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981207
>
2016-12-23_REVISION - M1981207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2020 4:55:39 PM
Creation date
12/28/2016 9:45:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981207
IBM Index Class Name
REVISION
Doc Date
12/23/2016
Doc Name
Request For Succession Of Operator
From
Western Slope Minerals
To
DRMS
Email Name
ACY
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Earth or Stone Products Land Value Gravel Productions Tax. Lessor will pay all real <br /> property taxes levied upon the property. Lessee shall have the right to protest any change <br /> l in assessed value,and Lessor agrees to cooperate in any such protest or litigation,and to <br /> sign any documents in connection therewith. As part of such payment of taxes, Lessee <br /> shall be responsible for preparing and reviewing the annual declaration forms. Should <br /> Lessor,for any reason,fail or refuse to pay such property taxes,Lessee may,in that event <br /> pay such taxes assessed upon the leased premises and apply such sums against future <br /> ' royalties earned. <br /> 11. UTILITIES. Lessee shall be responsible for the payment of gas and electric <br /> utilities associated with its operations, <br /> 12. INSPECTIONS. Lessee shall furnish Lessor with full, true and accurate <br /> information In response to any reasonable request in regard to the condition of the <br /> premises and allow representatives of t,essor to enter upon and Into all parts of the leased <br /> •• premises from time to time and at all reasonable times and hours for the purpose of <br /> inspecting or surveying the same. <br /> 13. USE BY LESSOR. Lessor retains the right to farm, graze, irrigate and <br /> otherwise use on a noninterference basis any portion of the premises not occupied by <br /> Lessees operation and wil#not intentionally interfere with Lessee's activities In anyway. <br /> Lessee shall have the sole right to determine the location and the orderly progressions of <br /> Its operation;provided,however,the present hayfield consisting of approximately fourteen <br /> (14)acres shalt not be mined during the First or Second phases of the mining operation as <br /> those phases are outlined in the Mined Land Reclamation Permit. Lessee shall relocate <br /> 1 and/or erect fences to keep livestock out of the pit operation area,and If,in the opinion of <br /> Lessee,locked gates are necessary on any access to operational areas,such gates shall <br /> be installed and maintained by Lessee with keys providers to Lessor. For purpose of <br /> ailowing Lessor to utilize the leased property for agricultural purposes,within 30 days after <br /> Lessor's written request, Lessee shall provide Lessor with a written plan that details the <br /> Lessee's best estimate of the scope and the location of operations and reclamation <br /> activities for the following 12 months. <br /> 14. ACCESS. Access to and from the plant site and operation area shall be'as <br /> provided in the Special Use Permit An access roads shall be installed and maintained by, <br /> Lessee,and both Lessee and lessor may utilize such roads but only in a mannerso as not <br /> to Interfere with each other's access. Lessee shall not close off or cause to be closed,the <br /> present access road to Highway 82 as It may presently exist or may be altered in response <br /> to any change in the location of the highway. <br /> 16. WATER. Lessor has provided for water rights for the leased premises through <br /> District Court, Water Division No.5,Case No.87CW364 as shown on EXHIBIT B. Water <br /> from the Basin Ditch will start as early as possible in the spring and continue as late as <br /> possible In the fall for Lessee's operation. Lessee will furnish and provide all ditches,pipes <br /> 0 c, Page 4of•4 <br /> 9 -�y�i� <br />
The URL can be used to link to this page
Your browser does not support the video tag.