Laserfiche WebLink
NEwMON T Newmont Mining Corpoianon <br /> 100 N 3"Stiect <br /> PO BOX 191 <br /> Victor,CO 8086080111 <br /> T 719-689 2977 <br /> r 719-689-3254 <br /> www newmont com <br /> SENT CERTIFIED, RETURN RECEIPT REQUESTED <br /> 7015-1660-0000-0779-8294 <br /> 21 December 2016 RECEIVED <br /> Mr. Elliot Russell V►-t eM,,�I <br /> Environmental Protection Specialist DEC 2 12016 <br /> Colorado Department of Natural Resources <br /> Division of Reclamation, Mining and Safety DIVISION OF RECLAMATION <br /> Office of Mined Land Reclamation MWINGANDSAFEfY <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> Re: M-1980-244 Cresson Proiect August Inspection - Request for an extension to address <br /> Problem #3 Arequa Gulch Valley Leach Facility Edge of Liner Signage <br /> Dear Mr. Russell: <br /> Within the DRMS August inspection report received 21st November 2017, Problem 3 noted that <br /> "Signs delineating the edge of the Arequa Gulch liner facility are missing and/or damaged". A <br /> corrective action due date was specified as 21 December 2016, requiring CC&V to "provide the <br /> division with photographic evidence that Edge of Liner Signs have been replaced before the <br /> corrective action due date". <br /> Due to a supply issue with the signage manufacturer, CC&V have been unable to meet the due <br /> date specified within the inspection report and therefore request a 30 day extension to the <br /> completion of this action, with the extended date being January 20, 2017. <br /> Should you require further information please do not hesitate to contact me at (719)-689-4048 <br /> or Cheyne.Mann@newmont.com. <br /> Sincerely, j <br /> Cheyne Mann <br /> Senior Environmental Specialist <br /> Cripple Creek and Victor Gold Mining Company <br /> CRM <br />