Laserfiche WebLink
6 (FORM 2 -Public filing) <br /> 8. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and redistributed for the re-establishment of <br /> vegetation. Specify approximate topsoil redistribution depth: <br /> Activity will be limited to pre-existing road, with no new areas disturbed. There is no <br /> topsoil on the road to be stripped or replaced. Reclamation will include blading to fill the <br /> mud pit and to eliminate e low berm, in or er to reestablish tha road. I he site will e <br /> monitored for weeds. <br /> 9. Describe how drill holes will be plugged(refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> Drill holes are expected to be dry. Closure will consist of backfilling all cuttings in the drill <br /> holes (or burying in the mud pit), then tremmying cement down the drill holes to fill them <br /> from the bottom up to the collar. A capped pipe may be set at ground su ace to <br /> 10. Describe how portals,adits,shafts,ponds,excavations,or other disturbances will be reclaimed(refer to Rule 3 and Rule 5 for <br /> specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br /> The mud in the mud pit will be allowed to drain dry. Any cuttings not backfilled down the <br /> drill holes will be placed in the mud pit to be buried. The pit will be backfilled and <br /> compacted with the bulldozed material during reclamation earthwork. <br /> 11. Describe how roads will be reclaimed or returned to their pre-prospecting(or better)condition: <br /> The existing access ro-2-d Afill contim a to re e-rrn2n@nt feature, and- will b e- <br /> reclaimed as described in item 5 above. <br />