My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-13_REVISION - M1981207
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981207
>
2016-12-13_REVISION - M1981207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:26:01 PM
Creation date
12/22/2016 2:33:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981207
IBM Index Class Name
Revision
Doc Date
12/13/2016
Doc Name
Request For Succession Of Operator
From
Western Slope Aggregates, Inc.
To
DRmS
Type & Sequence
SO3
Email Name
ACY
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Earth or Stone Products Land Value Gravel Productions Tax. Lessor will pay all real <br />Prop" taxes levied upon the property. Lessee shall have the rightto protest any change <br />in assessed value, and Lessor agrees to cooperate in any such protest or litigation, and to <br />sign any documents In connection therewith. As part of such payment of taxes, Lessee <br />shall be responsible for preparing and reviewing the annual declaration forms. Should <br />Lessor, for any reason, fall or refuse to pay such property taxes, Lessee may, in that event <br />pay such taxes assessed upon the leased premises and apply such scams against future <br />myaltles earned. <br />11, UTILITIES. Lessee shall be responsible for the payment of gas and electric <br />utilities associated with its operations. <br />2 12. INSPECTIONS. Lessee shall furnish Lessor with full, true and accurate <br />information in response to any reasonable request in regard to the condition of file <br />premises and allow representatives of lessorto enter upon and Into all parts of the leased <br />premises from time to time and at all reasonable times end hours for the purpose of <br />Inspecting or surveying the same. <br />13. USE BY LE=SSOR. Lessor retains the right to farm, gaze, Irrigate and <br />otherwise use on a noninterference basis any portion of the premises not occupied by <br />Lessee's operation and will not intentionally Interfere with Lessee's activities In anyway. <br />Lessee shall have the sole right to determine the location and the orderly progressions of <br />Its operation; provided, however, the present hayfield consisting of approximately fourteen <br />• (14) acres shall not be mined during the First or Second phases ofthe mining operation as <br />those phases are outlined In the Mined Land Reclamation Permit. Lessee shall relocate <br />and/or erect fences to keep livestock out of the pit operation area, and If, In the opinion of <br />Lessee, locked gates ane necessary on any access to operational areas, such gates shall <br />be installed and maintained by Lessee with keys provided to Lessor. For purpose of <br />allowing Lessor to utilize the leased property for agricultural purposes, within 30 days after <br />Lessor's written request, lessee shall provide Lessor with a written plan that details the <br />Lessee's best estimate of the scope and the location of operations and reclamation <br />activities for the following 12 months. <br />114. ACCESS. Access to and from the plant site and operation area shall be -as <br />Provided In the Special Use Perini. Ali access roads shall be Installed and maintained by - <br />Lessee, and both Lessee and Lessormay utilize such roads but only in a mannerso as not <br />to Interfere with each other's access. Lessee shall not close off or cause to be closed, the <br />pnassnt access road to Highway 82 as R may presenfly exist or may be altered in response <br />to any change In the location of the highway. <br />16. WATER. Lessor has provided forwater rights for the leased premises through <br />District Court, Water Division No. 6. Case No. 87CW364 as shown on EXHIBIT B. Water <br />from the Basin Ditch wiU start as early as possible in the spring and continua as late as <br />possible in the fall for Lessee's operation. Lessee will furnish and provide all ditches, pipes <br />0 ` f, Pane 4of.4 <br />91.1�1�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.