Technical Memorandum  <br />Solution Collection Piping Modifications  <br />NewFields Job No. 475.0106.006  <br />August 22, 2016  <br />  <br />  <br />  <br />Page 6  <br />During the 2016 construction season, the contractor will install 80 mil LLDPE geomembrane  <br />between the crest of the Process Solution Storage Area (PSSA) Pond and the Mill Site Earthwork  <br />containment berm.  Once the geomembrane is installed, the area will be completely lined and  <br />the pipe bench will be constructed below the containment berm as depicted in Section A on  <br />Figure 2.  If the barren pipe should fail along the mill platform, the barren solution would be  <br />contained within the limits of the Squaw VLF or within the sump of the Mill Platform.   <br />It is NewFields professional opinion that installation of the 12” diameter perimeter drain is not  <br />necessary  along  the  mill  platform  within  the  limits  shown  in  Figure 2 because this area is  <br />completely lined with geomembrane, posing no risk of barren solution migrating off the lined  <br />surface in the event of a failure.  There is sufficient surge capacity within the lined area to  <br />ensure containment of any flows that might result from a failure.    <br />If you have any questions or require additional information, please contact the undersigned.  <br />Sincerely,  <br />NewFields Mining Design & Technical Services    Reviewed by:  <br />  <br />  <br />  <br />  <br />Jay N. Janney‐Moore, P.E.     R. Michael Smith, P.E.  <br />Senior Engineer      Principal  <br />  <br />  <br />  <br />  <br />  <br />  <br />  <br />  <br />  <br />  <br />JNM/RMS/ng  <br />  <br />Attachment  <br />  <br />Addressee:  (via e‐mail)  <br />  <br />P:\Projects\0106.000 CC&V\Solution Collection Piping Modifications ng.docx